|
• |
Engineers will survey
the wall and agree with you the position of where
your new screen is to be mounted. |
|
|
• |
The
bracket will be mounted to the wall and to the
screen. |
|
• |
All connecting
leads concealed via surface mount conduit. |
|
• |
Careful mounting
and securing of your screen on to the wall |
|
• |
Connection of your
screen to existing equipment and power supply.
|
|
• |
A demonstration of
the screen and equipment working. |
|
• |
The site to be fully
cleaned and tidied before the engineers leave.
|
| • |
Expert engineers. |
| • |
Expert advice and
system planning. |